new hospital waste treatment plant




hospital waste incinerator for the waste from hospital, lab, etc. Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator manufacturer in China. All series included burning capacity 10kgs per hour, 30kgs per hour,50kgs per hour,100kgs per hour,150kgs per hour,300kgs per hour,500kgs per hour. Up to now, all models sale to all over the…
hot medical waste disposing machine, Operation Condition: 8-16 hr/ day Control: Built-in data recording Operating temperature: Incinerator /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: continuous loading, Top Loading Capacity/Burn rate per hour: 250 -300 kg/hr Material: External- 3 layers Internal lining: a fire proof material of pre-fired refractory bricks with Aluminium lining, resistant to corrosive waste or gas and to thermal shock Secondary Combustion Chamber: Type: horizontal/vertical Temperature: 1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment system : Capable of treating the flow of flue gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc Auxiliary device: Fuel cut-off device Waste feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT: GAS- SMOKELESS,ODORLESS ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Accessories: All standard accessories for incinerator, including but not limited to loading system, heat exchangers, pollution control system, ash removal system, including ladder and oil tanker (2500litre capacity). Operating Environment: The incinerator is capable to operate at the altitude of 2400mt above sea level. (according to the site conditions) Power Requirement: 220 Vac single phase or 380 Vac three phase 4 wire system 50HZ Installation Testing and Commissioning : to be conducted by certified or qualified personnel. Supplier shall provide the following documentation User (Operating) manual in English. Service (Technical / Maintenance) manual in English. Certificate of calibration and inspection from factory. Fast moving spare parts: Supplier is able to provide fast moving spare parts with quantities as described in the price schedule or their equivalent. Training: Supplier is able to provide training on operation, management and maintenance of incinerators. Warranty Comprehensive warranty for minimum 2 year. Maintenance Service during Warranty Period During warranty period supplier must ensure, corrective/breakdown maintenance whenever required. Supplier has a local agent or branch office in Ethiopia (please indicate the name and contact details of the agent) Supplier provides labor, lifting equipment and tools needed for the installation, testing and commissioning of the incinerator. The supplier will be responsible for the safety of its staff, workers and laborers during the installation, testing & commisssioning Able to provides all necessary information that would be used as an input for preparation of floor (platform) and room for the incinerator to be supplied such as the following; Lay outs (drawings) and pictures of the incinerators to be installed …
In assessing these options, the U.S. military held the assumption that the present dumpsite situated at Puntan Diablo on Tinian — the area where the Chinese team of investors is planning to develop in an integrated resort — will be closed and that a transfer station has been considered. MARFORPAC environmental specialist Sherri Eng said…
we are incinerator medical waste manufacturer. With years worth of experience in this sector, our medical range of incinerators are designed to cater for the economical needs of small clinics to the more demanding and specialized requirements of large hospitals in their waste management processes. Items/Model YD-30 YD-50 YD-100 YD-150 Burning Rate (kgs/Hour) 30 kgs/Hr….
we are waste incinerator manufacturer in china, focus on medical waste, pet animal and other solid waste incineration treatment. waste incinerator design with single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers. standard waste incinerator fixed with italy fuel burner and staninless steel long life time chimney. standard waste incinerator also fixed…
Basic Info. Export Markets:Global Additional Info. Trademark:clover Origin:China Production Capacity:1000 Sets Per Year Product Description Key Attributes: * All models with Dual combustion room. * Stainless Steel chimney/stack, long life. *based on order * High temperature, long life of incinerator. * Free or minimal installation onsite. * High burn rate, from 10kgs to 500kgs per…