Similar Posts
new hospital waste treatment plant
We are in the process of building a new hospital waste treatment plant and we are evaluating different technologies from around the world. We are looking to incinerate approx. 1 to 2 tons of biomedical waste per day using LPG for heating. Please send me all general information and quotes for machines of all ranges that could meet our needs. Also, please include emissions reports of all of the various machines that could be of interest to us especially with regards to dioxins and furals as well as lists of recommendations from past clients. If you have any government entities using your machines please include lists of whom they are as well as any documentation that you contain that can prove their use. Timing is also very important to us with regards of when the machines can arrive to Peru and be up and running. Therefore, it would be appreciated if you could include time frames and the whole process from purchase to installation and maintenance. Burning Rate:5–120kg/hour Minimum Operating Temperature:850o C(primary combustion) Maximum Operating Temperature:1450 oC(Afterburner chamber) Secondary Burning Capacity:Compulsory Density Insulation:20mm High Refractory Casting:Minimum 65mm Heavy duty refracting lining to withstand:1500 oC Average burn out time :maximum:3 hrs Fuel type:Diesel Fuel Consumption in L/hr:7.5 to 9 Residence time in secondary chamber:2sec Residue ash pot 100kg:Max 3.8kg
Burnaby garbage incinerator operator sued over pollution concerns
The Greater Vancouver Sewerage and Drainage District is suing Maxxam Analytics International Corp. and Covanta Burnaby Renewable Energy ULC for Supposedly failing to properly Examine fly ash samples in the district’s waste-to-energy facility in Burnaby. Non-hazardous fly ash is accepted and disposed of in the Cache Creek landfill, the claim states. Samples analyzed by Maxxam…
"filtro olio per tubo olio"
filtro olio per tubo olio
Medical Incinerator Specification
Capacity Not less than 500Kg/hr. Operation 24hr-7days/week continuous operation. Combustion chamber 2 combustion chamber. Temp. First combustion chamber 800-1000 C. Secandry combustion chamber 1000-1200 C, with the possibility to be upgraded to 1400 C. Combustion Efficiency 99.99% Retention time Of the flow gases not less than 2 Sec in the hot portion. Excess Oxygen concentration Of primary combustion chamber 3-6% max. Refractory The chambers should be lined with high thermal insulating refractory bricks with suitable thickness and with highly temp. resistance. Not less than 1400 C for the first combustion chamber, and not less than 1600 C for the secandry combustion chamber, and at the same time prevent the Temp. of the outside body of the chamber not higher than 70 C. Doors Should be lined with the same bricks, and the edges lined with special suitable insulating material to prevent any gas escaping, and the doors should be kept under negative pressure during the operation. Air Emission Control System With high destruction and removal efficiency (DRE). Not less than 99.9999 as per KEPA. Wet System If the system equiped with a CEMS washing the flow gas with water, then it should be manufactured from suitable anti corrossion materials, and equiped with pH meter to measure and neutralize the water. It should be able to use the water in closed recycled circuit many times before treating/ discharging into the sewage system in compliance with KEPARS. Chemical dosing It should be equiped with suitable autochemical dosing system to control the pH for the water of the wet scrubber system including sensors. Chimney It should be suitable with the capacity and the technical specifications, with height not less than 12m from ground level. With easy opennable sampling point equal about 3 inch, and the optimum sampling locations is at least 8D downstream direction and 2D upstream from any flow disturbancies. Sampling point Should be equiped with a platform located down the sampling point by a distance not less than 1 m, and equiped with suitable stairs from ground to the port with comfortable slope. Ash Removal It should be auto ash removal system. Fuel It should be dual system, such as diesel and natural gas. Feeding System Should be auto feeding system into primary chamber. Control Room Should be equiped with a control panel shows Temp. of the combustion burners, gas monitoring, digital Temp. indecation for the primary/secondary chambers, digital Temp. indication for the gases…etc. it should be also Auto operation, burnures on/off auto lamps switch, auto start/stop for air emission control system, auto gas continuous monitoring system reading and print out of gas emission parameters…etc. Cooling System The primary chamber should be provided with auto cooling systemthrough nozzles to permit direct cooling if the Temp. will be heigher than 1100 C. Inter-lock system The incinerator should be equiped with inter-lock system to prevent feeding the waste to the primary chamber if the combustion Temp. less than 500 C. Flue treatment and cleaning…
N95 Face Mask Machine Production Line on Sale Now! $250,000USD per set
N95 Face Mask Machine Production Line on Sale Now! $250,000USD per set N95 Face Mask Machine Production Line on Sale Now! $250,000USD per set l Dimension(L*W*H): 1037*855*1780 l Power Supply 15.3kw mono phase l Net Weight: approx.: 1500kg HICLOVER – Medical Environmental WWW.HICLOVER.COM Waste Incinerators Medical Waste Incinerator Pet Animal Cremation Solid Waste Incinerator Tel: +86-25-8461 0201 Mobile: +86-13813931455(whatsapp/wechat) Website: www.hiclover.com Email: [email protected]…
Infectious Waste Incinerators
Basic Info. Export Markets:Global Additional Info. Trademark:nanjing clover Origin:Nanjing Cn Product Description Key Features: * All models with Dual combustion chamber. * Stainless Steel chimney/stack, long lifetime. *according to sequence * High temperature, long lifetime of incinerator. * Free or minimal installation on site. * High burn rate, from 10kgs to 500kgs per hourto 6ton…