hot medical waste disposing machine, Operation Condition: 8-16 hr/ day

hot medical waste disposing machine, Operation Condition: 8-16 hr/ day  Control: Built-in data recording Operating temperature: Incinerator  /Primary Combustion Chamber Primary Chamber: 900 – 1200 0C Type: horizontal/vertical Temperature:  1200- 1300 oC Residence time of gases : >2 seconds Ash Residue: <5% of original waste size Ash Handling System: Both Automatic and manual removal of Ash. Must ensure removal/treatment of hazardous remnants of ash Flue gas treatment   system : Capable of treating the flow of flue  gas as the incinerator is operating at its maximum capacity Auxiliary device: Water level gauge, pressure sensor, PH sensor..etc  Auxiliary device: Fuel cut-off device Waste  feeding mechanism: Automatic pneumatic/hydraulic waste loading system or conveyor belt , capacity 650-800 L at a time                                                                                                                                       Chimney (Stack): Type: Vertical type height:>7 meter’ Material: Fireproof cast, stainless steel OUTPUT:  GAS- SMOKELESS,ODORLESS  ASH -Max <5% of original waste size Reduction of Pollutant gas SO2, HCL, HF and line particulate Emission standard: WHO/ European Test report for emission testing provided? Heat exchange mode: Automatic Type: Constant loading, Top LoadingCapacity/Burn rate per hour: 250 -300 kg/hr Substance:External- 3 layers Internal Liner:  a fire proof material of pre-fired refractory bricks Using Aluminium Liner resistant to corrosive Gas or Waste and Also to thermal shockSecondary Combustion Chamber:

Bid to burn waste from out of City in Newhaven Incinerator

Veolia is looking to supply non-recyclable commercial and industrial waste for its Newhaven Incinerator from regions neighbouring East Sussex and Brighton and Hove. It asserts this will permit the incinerator to create sufficient energy to power 25,000 homes always. However, cllr Rod Main from Newhaven said this could lead to more pollution and trucks. Veolia…

Incinerator with Ease of Jealousy in weight: 60 Kg/h.

Ability of destruction in weight: 60 Kg/h. It should be able to work less 10 hours/day This incinerator must have the ability to destruct all combustible wastes produced by hospitals, private practices, labs, institutes, etc… Design Specification: Types A, B, C, D, and E of medical waste  “PYROLYTIC” combustion, by simply controlling the gasification of…

Texas Ebola waste Won’t Be disposed in Louisiana

On Friday Attorney General Buddy Caldwell declared the State of Louisiana reached an arrangement with Texas incinerator Veolia Environmental Services and Louisiana toxic waste landfill Chemical Waste Management to ensure that incinerator ash associated with the recent Dallas Ebola virus occurrence won’t be transported or disposed of in Louisiana,. On Oct. 13 the Louisiana Attorney…

New Metro incinerator Could cost $1.3 billion more than planned: study

Metro Vancouver is taking more heat over its strategy to build another garbage incinerator, with a new study commissioned by waste firm Belkorp Environmental Services suggesting the move could cost up to $1.3 billion more than expected. The analysis, conducted by ICF International on behalf of Belkorp, comes as Metro Vancouver attempts to take care…

Smaller cremators incinerators

Smaller cremators that will run diesel and will be capable of doing all the other dogs/cats/pets that we have. We only cremate pets individually so this is what we require. Have your company as member of Markis Hospital waste management group as planer or supplier, contractor of solutions or operating partners of the solution of hospital waste management in the projects we are developing, starting with Larissa and Volos. Members of Markis waste management group will also have the possibility to provide training and technical services to the health sector of Greece and other countries via the TSC which we plan to make the same time in Larissa (enclosed diagram indicates the role of each party joining Markis waste management group). ● Able to burn 25-30kg per hour ● Consist of two chambers to ensure significant reduction in emission ● Be capable of temperature in range of 800c to 1000c ● Low maintenance design ● Must be Diesel fuelled ● Need more than 15amp 220- 250V power ● kW Consumption power consumption to be stated ● Onboard or in-built fuel storage storage tank & should use no more than 12L of dies el per hour to burn 25-30kg of waste ● Solid waste reduction in range of 90-97% ( should be routinely achieved) 1. –  2 medical waste autoclaves 350ltr and 100ltr 2. – 1 medical waste shredder 3. –  3 medical macerators 4. – 27 Waste transfer trolleys.